CHALLENGE
A combination of pressures prompted Derby City Council to review its on-premise data centre strategy in 2015. Not only was its facilities management contract for managed IT services and data centre up for renewal, but there were also financial restraints to contend with.

The council opted to migrate all of its workloads into the public cloud in order to reduce budgetary pressures, remove the burden of data centre management and operate within a more flexible IT environment.

However, the migration quickly encountered challenges. It became abundantly clear that key legacy applications, which were never designed to run in the cloud, would consume more resources and incur more costs when hosted in a public cloud environment than anticipated. Additionally, there were technical limitations preventing some applications from being migrated.

Alistair Taylor, Project and Change Manager at Derby City Council, explains: “Price escalation, plus the need to purchase more resources than anticipated, meant that by the time we had migrated around half of our data centre workloads, the operational costs were already double what we had projected for the entire project.”

Additionally, the operator of the council’s on-premise data centre implemented a price increase, which accelerated the need for an alternative plan.

SOLUTION
CDW was invited to support the council by developing a plan to help overcome its infrastructure challenges. The first stage was a detailed analysis of the existing data centre architecture, including an in-depth assessment of the legacy hardware, of which some could be retained, and other elements required replacement.

After a period of technology trials and testing, the Nutanix Enterprise Cloud Solution was selected as the best fit for the council’s needs. This solution unlocked the same scalability and pay-as-you-grow economics as the public cloud, but in a format better suited to Derby City Council’s workload mix.

The solution enabled full virtualisation at a lower cost through migration of VMs to Nutanix AHV hypervisor. The council also gained integrated control of physical and virtual resources with Prism, the Nutanix central management console.

The initial configuration recommended by CDW, a Nutanix Elite partner, was a 13-node Enterprise Cloud cluster. This accommodated the council’s data centre workloads that could not be moved into the public cloud, while immediately reducing the required rack space by almost 40 percent with corresponding reductions in power and cooling overheads.

Once the existing server workloads had been secured, CDW turned its attention to the workloads that had been migrated to the public cloud. The council purchased a further 13 nodes, 7 of which were provisioned to take advantage of the Nutanix AHV hypervisor to further reduce licensing costs.

Working closely with the council’s internal IT specialists, CDW managed the rare and complex process of reversing elements of the migration by restoring hundreds of workloads and applications from the public cloud back to the on-premise data centre. The significant expertise, consultancy and design services of CDW proved crucial in the successful completion of this phase within just four months.

OUTCOME
CDW helped Derby City Council repatriate almost all of its 400+ workloads, leaving just three in a public cloud environment. The council chose to retain public cloud services to meet its email and office productivity requirements using Microsoft Office 365. The relocation of the council’s on-premise data centre to a more affordable provider has also been completed.

The combined impact of the transition has boosted performance and brought down costs. Measurement of application performance suggests a 40 percent improvement in user experience. The project has also reduced the council’s annual data centre running costs from over £200K to less than £37.5K. Looking ahead, the council expects to realise total IT savings of around £1.7 million over the next five years, compared with the projected costs of the original public cloud plan.

“With lots of tools and technologies available, moving applications to a public cloud platform is relatively straightforward,” Alistair explained. “Migrating workloads back to on-premise is less common and more complex, requiring development of custom migration tools. This is something we couldn’t have done without the help of an expert partner like CDW.”

Moving forward, Derby City Council intends to migrate all remaining workloads to the Nutanix AHV Hypervisor technology solution, further lowering costs by eliminating the licensing overheads. The council is also planning to leverage the resilience of the Enterprise Cloud architecture to provide for disaster recovery and data protection requirements. There are also long-term plans to enable network segmentation using AHV and Nutanix Flow, to build a more flexible software-defined infrastructure.

Supplier Profiles

SA Group

SA Group is a Cyber Security, P3M and Technical consultancy working in vital Public Sector market

Mitra Innovation

Mitra Innovation was formed to provide end-to-end technology solutions to our clients – drawing f